
Archived Story: This article is part of our newsletter archives. It has
been preserved for reference, but the information may no longer be current.
Recently, the College of Engineering held a Topping Out event to celebrate the placing of the final steel beam in the new Link. Go to Construction Central (link below) to see a video recapping that event and for updates on Phases 1 and 2 of the construction project. More details at: https://engineering.unl.edu/construction-central/