Figure 1. Excavation continues above the tunnel collapse and on Friday a series of three trench boxes, each 10 feet tall by 20 feet wide by 20 feet long, were droppped down on top of the tunnel to create a safe place for working. (Photo courtesy the Goshe The Goshen Irrigation District gave an update on the progress of the tunnel repair during the weekly Fort Laramie-Gering Irrigation Ditch Situational Update conference call. More details at: https://cropwatch.unl.edu/2019/canal-repair-update