On any given day in the United States, motorists and pedestrians make their way across structurally deficient bridges roughly 178 million times. With over 47,000 deficient bridges currently in use, infrastructure experts are looking for long-lasting bridge solutions that can be installed quickly and efficiently. These Accelerated Bridge Construction (ABC) products are key to building and replacing bridge infrastructure across the nation.
Valmont Structures© Con-Struct™ Bridge System offers quality pre-fabricated bridge elements that can be installed quickly. The system consists of two parts, a galvanized steel bridge beam and the driving surface. Both components are designed and constructed for quick placement.
Valmont will be featured in a free Nebraska LTAP webinar about this new product line on Wednesday, February 24 beginning at 10:00 AM CST/9:00 AM MST. Register at https://go.unl.edu/valmont to receive a link to the session.
More details at: https://go.unl.edu/valmont